{"id":5910,"date":"2025-05-02T23:09:03","date_gmt":"2025-05-02T23:09:03","guid":{"rendered":"https:\/\/bolincreek.org\/blog\/?p=5910"},"modified":"2025-05-04T12:08:46","modified_gmt":"2025-05-04T12:08:46","slug":"why-friends-of-bolin-creek-opposes-the-1-4-million-design-plan-for-the-bolin-creek-greenway-in-carrboro","status":"publish","type":"post","link":"https:\/\/bolincreek.org\/blog\/2025\/05\/02\/why-friends-of-bolin-creek-opposes-the-1-4-million-design-plan-for-the-bolin-creek-greenway-in-carrboro\/","title":{"rendered":"Why Friends of Bolin Creek opposes the $1.4 million design plan for the Bolin Creek Greenway in Carrboro"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The Friends of Bolin Creek opposes using the town of Carrboro\u2019s limited budget to design the greenway for several reasons, which are detailed here.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">1. It\u2019s poor timing in 2025 for Orange County towns to take on additional expenses when the County is resetting property tax evaluations to reflect current market values. When property values are updated, potentially higher tax bills for property owners will result. Greenways and large infrastructure projects are typically funded by the regional transit authority (Triangle West). After reviewing the local priorities and funding availability, Triangle West did not include the Bolin Creek greenway for funding in 2026.<\/span><\/span><\/span><\/p>\n<p><span style=\"font-weight: 400;\">2. Based on the preliminary engineering study conducted in 2023, known environmental constraints could raise the actual construction cost to well <\/span><b>beyond $14 million<\/b><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">, with no guarantee of approval by future Town Councils. In other words, this $1.4M could be wasted without a realistic plan for financing construction.<\/span><\/span><\/span><\/p>\n<p><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">3. Carrboro should develop a conservative budget this year when significant Federal cuts in funding for housing and human services are anticipated. $1.4 M is a considerable discretionary expense.<\/span><\/span><\/span><\/p>\n<p>4. Chapel Hill and UNC are pursuing growth plans for Carolina North. .Carrboro should not commit funds before knowing what neighboring jurisdictions will do and where Carrboro\u2019s connectivity to that new development is best achieved.<\/p>\n<p><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">5. Better, more direct and cheaper routes are on the funding request list:\u00a0 Press for TWTPO (formally DCH MPO) Prioritization and funding of the Seawell School Sidepath that immediately connects three schools (HIgh school, Seawell Elementary and Smith Middle School) with Homestead neighborhoods with adjacent-off road sidepath for cyclists and pedestrians, additionally, meets needs for Safe Routes to Schools. Direct and shorter connectivity between current and planned bikeways on Estes Drive.<\/span><\/span><\/span><\/p>\n<p><span style=\"font-weight: 400;\">6. Carrboro&#8217;s fiscal situation. To bring staff salaries and benefits up to meet a competitive standard (2023 compensation study), the Town borrowed $4.1M from its reserve fund (emergency savings). That money, which by law cannot be used to pay salaries, must be paid back in the 2025-2026 budget. As the Town Council begins deliberations to finalize that budget, they face a $5.9M deficit (the compensation payback) plus insufficient revenue to cover the six (6) major budget priorities outlined during the April 8 worksession.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">7 . Climate and Environmental Stewardship. <\/span><span style=\"font-weight: 400;\">The <\/span><span style=\"font-weight: 400;\"><a href=\"https:\/\/bolincreek.org\/blog\/wp-content\/uploads\/2023\/12\/BolinCreekGreenway_Review-of-Master-Plan.pdf\">Summit Engineering Report and Sungate Technical Review of the Carrboro Greenway Plan<\/a>,<\/span><span style=\"font-weight: 400;\"> commissioned by the Town of Carrboro, cites many financial and physical barriers to constructing a paved bikeway in the riparian zone of Bolin Creek Phases 3 and 4.<\/span><span style=\"font-weight: 400;\"> Among the barriers listed are:<\/span><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Stormwater impacts<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Impervious surface expansion into a natural forest environment. Carrboro taxes residential property owners for the impervious surface of their dwelling site.\u00a0\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">loss of canopy, exposing the forest to heat\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Loss of carbon-sequestering tree canopy along the riparian buffer<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">impact on forest, aquatic, and riparian wildlife\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The Creekside alignment cannot comply with the Jordan Lake buffer rules.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It crosses the Norfolk Southern RR several times, raising complex right-of-way issues;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Steep topography will make ADA compliance difficult.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The Creekside alignment is in a Zone AE floodway, exposing the paved trail to damage by flooding and large maintenance costs.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The required \u2018No rise\u2019 certification may not be achievable.<\/span><\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Friends of Bolin Creek opposes using the town of Carrboro\u2019s limited budget to design the greenway for several reasons, which are detailed here. 1. It\u2019s poor timing in 2025 for Orange County towns to take on additional expenses when the County is resetting property tax evaluations to reflect current market values. When property values [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"post_folder":[],"class_list":["post-5910","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/posts\/5910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/comments?post=5910"}],"version-history":[{"count":9,"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/posts\/5910\/revisions"}],"predecessor-version":[{"id":5920,"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/posts\/5910\/revisions\/5920"}],"wp:attachment":[{"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/media?parent=5910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/categories?post=5910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/tags?post=5910"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/bolincreek.org\/blog\/wp-json\/wp\/v2\/post_folder?post=5910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}